Installation Instructions

Assembly

Units may be assembled in lengths outside the trench. Ensure 4 clips are used on each bell/spigot joint.

<< More details ....

Download Assembly Video - Large File 2Mb - Smaller File 0.7Mb

Trench Construction

The following instructions are believed to be compliant with Network Rail specifications, but in case of ambiguity, specifications provided by Network Rail shall apply.

Excavate trench 300mm wider to allow 150mm clearance each side of duct bank.

Deep enough to form a graded bedding (pea gravel) 150mm below and 1100mm cover from top of lowest rail to top of ducts.

Where multiple banks are to be laid, allow 50mm between units to enable proper compaction.

Fill around the ducts with pea gravel to a depth 150mm above the top of the ducts

 

Downloadable instructions (pdf format 1.45Mb)

Download Assembly Video - Large File 2Mb - Smaller File 0.7Mb

 

 

 

 

Page last updated 18-Apr-2007
© 2003-2006 Carson Industries Ltd

Home - Application - Products - Ordering - Installation - Contact - Photo Gallery - Carson Europe
Link to Carson Europe site


Racecourse Road
Roscommon
Ireland
+353 9066 25922